Case Study

Using ecological risk assessment to evaluate environmental impacts of desalination effluent

Our client aimed to build a desalination plant to increase the supply of fresh water required for sustaining local communities...

icon
Case Study

Supporting the permitting process for the water intake structure of a proposed desalination facility

A client retained Integral to support a contested water intake permit for a proposed desalination facility. Community members were concerned...

icon
Case Study

A baseline biological characterization of source water in support of a permit renewal for a cooling water intake structure

A client aimed to redevelop a former industrial facility into a sustainable 10–MW data center to house core computing services...

icon
Case Study

A fish and benthic invertebrate community survey in support of a pre-design investigation

Contaminated substrate in an urban river required excavation to achieve the risk-based cleanup objectives. This remedial process would eliminate all...

icon
Case Study

Strategic Remedial Investigation in a Tidal Embayment

Situated within the Hackensack River estuary, the Berry’s Creek Study Area (BCSA) has a long urban and industry history and...

icon
Case Study

Springfield—Remedial Approach Development at a DNAPL Site

Under a bankruptcy settlement, our client is responsible for the cleanup and facilitation of redevelopment of a site in Springfield,...

icon
Case Study

Meridian—Development of a CSM and Corrective Measures Study at a Former Wood Treatment Facility

Under a bankruptcy settlement, our client is responsible for cleanup and facilitating redevelopment of a Resource Conservation and Recovery Act...

icon
Case Study

Navassa—Site Investigation and DNAPL Remediation at a Former Wood Treating Facility

Under a bankruptcy settlement, our client is responsible for the cleanup and facilitation of redevelopment of Superfund site in Navassa,...

icon
Case Study

Columbus—Site Investigation and Multimedia Remediation

Under a bankruptcy settlement, our client is responsible for cleanup and facilitation of redevelopment at a Superfund site in Columbus,...

icon
Case Study

Strategic Planning at a Former Wood Treating Site

Under a bankruptcy settlement, our client is responsible for the cleanup and facilitation of redevelopment at a site in Kansas...

icon
Case Study

Rapidly Repairing A Mission-Critical Groundwater Treatment Control System Remotely

After routine preventative maintenance, a client in Texas could no longer start their CERCLA-required groundwater treatment system. They tried to...

icon
Case Study

PFAS Multiphase Soil Capping Project

Per- and polyfluoroalkyl substances (PFAS) were found at high concentrations in surface soils at an active chemical manufacturing plant, posing...

icon
Case Study

Support of Environmental Reserve Setting

Our client is a multinational corporation with a large environmental risk portfolio that includes dozens of potentially contaminated sites across...

icon
Case Study

Riverbank Source Control Measure, Portland Harbor

Historical riverbank fill composed of erodible soil containing PCBs sloughed into the river during flood events at an upland industrial...

icon
Case Study

Sediment Remedial Design at a Multiparty Superfund Site

With the furthest downstream project area in a uniquely depositional region within a Superfund site, our client faces unique challenges...

icon
Case Study

Settling Natural Resource Damage Responsibilities for Steel Mill Operations

Trustees drafted an allocation of natural resource damage shares for Portland Harbor using nontransparent calculations and misrepresentations of facility information.  The...

icon
Case Study

Untangling Superfund Liability for Current and Historical Steel Mill Facilities at the Portland Harbor NPL Site

Our client operates a steel mill and associated facilities within a large Superfund site and is known for their cooperative...

icon
Case Study

Complex Remedial Design in a River Estuary

Mercury contamination from decades of industrial operations on the Penobscot River estuary have impacted wildlife and impaired resources.  A consent...

icon
Case Study

Property Owner Advocacy During Remedial Design

Owning property on a Superfund site can cause undue burden to the property owner, especially if they are not a...

icon
Case Study

Addressing the Vapor Intrusion Pathway at Middlefield‐Ellis‐Whisman Superfund Study Area

One of Integral’s core values is collaboration. Many of our projects, including this one, involve working with other consultants, multiple...

icon
Case Study

Developing Former Manufactured Gas Plants in New York City

Pollution left behind by decades of gas manufacturing in the 1800s and 1900s severely complicated the prospects of developing large...