Project
Wildflower Solar Wetland Delineation and Species Permitting
Key Personnel
Brian Boroski, Ph.D. Managing Principal, Business Director – Ecological Science and Design
Sacramento County
Integral staff assisted a solar energy developer with the siting and permitting for a proposed 15-megawatt, photovoltaic solar energy generation facility in Sacramento County. Our team worked with the project developer to design the project to minimize impacts, which resulted in the timely issuance of a nationwide permit and a Concurrence Letter from the USFWS. Services included:
- wetland delineation
- protocol-level surveys for federally-listed vernal pool crustaceans
- plant surveys
- assisting with 404/401 permit application packages
- securing all required compensatory mitigation for a proposed
- preparing a Biological Assessment analyzing the proposed project’s effects on federally listed species, primarily the vernal pool fairy shrimp
- providing a revegetation plan for areas of the project site temporarily disturbed during project construction
- resolving nesting bird conflicts, including an occupied nest of the California-listed Swainson’s hawk located immediately adjacent to the project site
- identifying the ideal location for facility construction within the project site that would minimize potential biological impacts to the extent possible.