Special-Status Species
Parker Butte Solar Project, Yerington, Nevada — Served as field crew lead for all biological surveys, including habitat assessments, jurisdictional waters surveys, and BLM special-status species surveys for dark and pale kangaroo mouse trapping surveys, bat habitat assessments, avian point count surveys, and golden eagle surveys. Prepared survey reports for all surveys and Waters of the United States (WOTUS) memoranda and reports for submission to U.S. Army Corps of Engineers (USACE) for an approved jurisdictional determination (AJD).
Samantha Solar Project, Ely, Nevada — Served as field crew lead for all biological surveys, including habitat assessments, jurisdictional waters surveys, and special-status species surveys for dark and pale kangaroo mouse trapping surveys, pinyon jay surveys, pygmy rabbit surveys, rare plant surveys, avian point count surveys, and golden eagle surveys. Prepared survey reports for all surveys for submission to BLM and WOTUS memoranda and reports for submission to USACE for an AJD.
Panoche Valley Solar Project, Panoche, California — Performed construction monitoring for nesting birds and raptors, giant kangaroo rat, California tiger salamander, San Joaquin kit fox, burrowing owl, San Joaquin antelope squirrel, and blunt-nosed leopard lizard and spent time as the lead environmental monitor in charge of field biological staff and communication with all construction staff. Conducted surveys for the above species and wrote the relevant survey reports. Assisted Level II surveyors with protocol-level blunt-nosed leopard lizard surveys for 3 days and observed one adult blunt-nosed leopard lizard. All other surveys for the above species included nonprotocol surveys for blunt-nosed leopard lizard concurrently. Assisted designated biologists with trapping and processing giant kangaroo rats from onsite and relocation sites, constructed giant kangaroo rat pens, and performed hand excavations of burrows. Assisted with San Joaquin kit fox trapping and performed San Joaquin kit fox surveys and monitoring. Also assisted with monthly California Department of Fish and Wildlife (CDFW), USFWS, and County of San Benito report preparation.
Arrow Canyon Solar Project, Moapa, Nevada — Conducted preconstruction presence-absence and density surveys for Mojave desert tortoise over approximately 120 survey miles. Compiled all results and prepared survey reports. Personally discovered two Mojave desert tortoises and observed desert tortoise tracks, scat, and burrows. Also assisted in preparation of the SEIS document biological sections for the project for the BIA. Managed and conducted construction monitoring for a large-scale solar farm to the northeast of Las Vegas, Nevada. Conducted jurisdictional waters surveys, including preparation of a memorandum and report for submission to USACE for an AJD. Also conducted preconstruction desert tortoise, nesting birds, rare plant, and cacti surveys. Assisted with Mojave desert tortoise health assessments and handled two adult tortoises under supervision. Managing and conducting postconstruction raven monitoring surveys.
Australis Project, Centinela, California — Performed surveys for California Endangered Species Act (CESA) and federal Endangered Species Act (ESA) listed species including San Joaquin kit fox, burrowing owl, and Swainson’s hawk. Assisted with formal wetland delineations for the project area. Also conducted jurisdictional determinations under the Clean Water Act and California Fish and Game Code 1600 and a habitat assessment survey.
Bonanza Solar Project, Indian Springs, Nevada — Conducted presence-absence and density surveys for desert tortoise. Personally discovered four Mojave desert tortoises and observed desert tortoise tracks, scat, and burrows. Also conducted jurisdictional waters, Gila monster, chuckwalla, burrowing owl, thrasher, and rare plant surveys. Prepared all postsurvey reports as well as the biological resources technical report, desert tortoise translocation plan (DTTP), biological assessment, and WOTUS memorandum and report for submission to USACE for an AJD.
Spikes Peak Solar Project, Santa Nella, California — Prepared study plans; performed Swainson’s hawk and raptor surveys as well as burrowing owl, San Joaquin kit fox, and badger surveys; and prepared survey reports.
Arida Solar Project I and II, Laughlin, Nevada — Conducted a habitat assessment, jurisdictional waters surveys, and protocol presence-absence Mojave desert tortoise surveys. Personally discovered two adult desert tortoises during surveys. Also prepared survey reports and report for submission to USACE for an AJD.
Vulcan Solar Project, Arlington, Arizona — Prepared the study plan for biological and jurisdictional waters surveys. Led jurisdictional waters, burrowing owl, Sonoran desert tortoise, and desert kit fox surveys. Also conducted a habitat assessment and assisted with report preparation. Prepared an aquatic resources report and AJD documents.
Chuckwalla (West Moapa) Solar Project, Moapa, Nevada — Conducted presence-absence and density surveys for Mojave desert tortoise, compiled all results, and assisted with survey report preparation. Personally discovered two Mojave desert tortoises and observed desert tortoise tracks, scat, and burrows. Also conducted Gila monster, chuckwalla, and burrowing owl surveys and served as field team lead. Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Desert Obsidian Solar Project, Henderson, Nevada — Conducted presence-absence and density surveys for Mojave desert tortoise. Also conducted Gila monster and burrowing owl surveys and assisted with survey report preparation.
Wistaria Ranch Solar Project, El Centro, California — Conducted preconstruction burrowing owl monitoring, nesting bird and raptor surveys, artificial burrow construction, multiple burrow excavations, and agency-approved passive burrowing owl exclusions and relocations. Prepared postsurvey reports and managed relevant databases.
Lost Hills Solar Project, Lost Hills, California — Assisted with San Joaquin kit fox surveys.
Sun Streams Solar Project I, II, III, and IV and PVS, Phoenix, Arizona — Conducted preconstruction burrowing owl clearance surveys, nesting bird surveys, and data compilation. Also prepared WOTUS memoranda and reports for submission to USACE for an AJD.
Arco-Twisselman Reconductoring Project, Lost Hills, California — Conducted all relevant fieldwork and prepared a BTR documenting vegetative covertypes, potential for occurrence of special-status species plants and animals, and potential project impacts in support of the proposed project. Surveyed for ESA- and/or CESA-listed species including giant kangaroo rat, San Joaquin antelope squirrel, blunt-nosed leopard lizard, San Joaquin kit fox, burrowing owl, California tiger salamander, nesting birds, vernal pool fairy shrimp, and rare plants.
Blythe II Solar Project, Blythe, California — Served as a biological surveyor for Mojave desert tortoises, nesting birds, and other special-status species. Also assisted with Mojave desert tortoise protocol clearance surveys.
Campo Verde Solar Project, El Centro, California — Served as a biological surveyor for a variety of postconstruction tasks, including avian mortality surveys, burrowing owl monitoring, flat-tailed horned lizard monitoring, revegetation surveys, marsh water level monitoring and mapping, and raven monitoring. Also served as team lead in charge of all training, organizing, and managing field staff. Conducted a variety of database management tasks for all aspects of the project.
Centinela Solar Project, El Centro, California — Served as a biological surveyor for postconstruction avian mortality surveys.
Calipatria Solar Project, Calipatria, California — Served as team lead and biological project coordinator for postconstruction avian mortality surveys. Tasks included mortality surveys, carcass removal surveys, database management, and preparation of semiannual and cumulative project reports for submittal to CDFW and USFWS.
Winston Solar Project, Bakersfield, California — Prepared the biological resources technical report. Also prepared study plans; performed Swainson’s hawk and raptor surveys, jurisdictional waters surveys, and burrowing owl surveys; and prepared survey reports.
CEQA/NEPA
Arrow Canyon Solar Project, Moapa, Nevada — Assisted in preparation of the SEIS document biological sections for the project for the BIA. Managed and conducted construction monitoring for a large-scale solar farm to the northeast of Las Vegas, Nevada. Also conducted preconstruction presence-absence and density surveys for Mojave desert tortoise over approximately 120 survey miles. Compiled all results and prepared survey reports. Personally discovered two Mojave desert tortoises and observed desert tortoise tracks, scat, and burrows. Also conducted jurisdictional waters surveys, including preparation of a memorandum and report for submission to USACE for an AJD. Also conducted preconstruction desert tortoise, nesting birds, rare plants, and cacti surveys. Assisted with Mojave desert tortoise health assessments and handled two adult tortoises under supervision. Managing and conducting postconstruction raven monitoring surveys.
Tavaci (Chuckwalla) Solar Project, Moapa, Nevada — Prepared the biological assessment and assisted in preparation of the EIS document biological sections for the project for BIA and USFWS. Also prepared the DTTP. Conducted presence-absence and density surveys for desert tortoise, compiled all results, and assisted with survey report preparation. Personally discovered four Mojave desert tortoises and observed desert tortoise tracks, scat, and burrows. Also conducted Gila monster, chuckwalla, and burrowing owl surveys and served as field team lead. Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD. Conducted biological compliance monitoring for geotechnical work.
Yahthumb Solar Project, Moapa, Nevada — Prepared the biological assessment and DTTP and assisted in preparation of the biological sections of the EIS document for the project for BIA and USFWS.
Round Mountain 500-kV Dynamic Reactive Support Project, Shasta County, California — Prepared the BTR in support of the California Public Utilities Commission (CPUC) Proponents Environmental Assessment (PEA) application. Prepared biological sections for the PEA. Prepared survey plans and oversaw biological surveys.
Gates 500-kV Dynamic Reactive Support Project, Huron, California — Prepared the BTR in support of the CPUC PEA application. Prepared biological sections for the PEA. Prepared survey plans and oversaw biological surveys.
Power the South Bay and Power Santa Clara Valley Projects, San José, California — Prepared the BTR in support of the CPUC PEA application. Conducted habitat assessment surveys and jurisdictional determinations under the Clean Water Act and California Fish and Game Code 1600 of waterways located within the project area.
Compliance Monitoring
Panoche Valley Solar Project, Panoche, California — Performed construction monitoring for nesting birds and raptors, giant kangaroo rat, California tiger salamander, San Joaquin kit fox, burrowing owl, San Joaquin antelope squirrel, and blunt-nosed leopard lizard and spent time as the lead environmental monitor in charge of field biological staff and communication with all construction staff. Conducted surveys for the above species and wrote the relevant survey reports. Assisted Level II surveyors with protocol-level blunt-nosed leopard lizard surveys for 3 days and observed one adult blunt-nosed leopard lizard. All other surveys for the above species included nonprotocol surveys for blunt-nosed leopard lizard concurrently. Assisted designated biologists with trapping and processing giant kangaroo rats from onsite and relocation sites, constructed giant kangaroo rat pens, and performed hand excavations of burrows. Assisted with San Joaquin kit fox trapping and performed San Joaquin kit fox surveys and monitoring. Also assisted with monthly CDFW, USFWS, and County of San Benito report preparation.
Arrow Canyon Solar Project, Moapa, Nevada — Managed and conducted construction monitoring for a large-scale solar farm to the northeast of Las Vegas, Nevada. Also conducted preconstruction presence-absence and density surveys for Mojave desert tortoise over approximately 120 survey miles. Compiled all results and prepared survey reports. Personally discovered two Mojave desert tortoises and observed desert tortoise tracks, scat, and burrows. Also assisted in preparation of the SEIS document biological sections for the project for BIA. Also conducted jurisdictional waters surveys, including preparation of a memorandum and report for submission to USACE for an AJD. Also conducted preconstruction desert tortoise, nesting birds, rare plants, and cacti surveys. Assisted with Mojave desert tortoise health assessments and handled two adult tortoises under supervision. Managing and conducting postconstruction raven monitoring surveys.
Pastoria Solar Project, Bakersfield, California — Performing construction monitoring and a variety of tasks including burrow monitoring, excavation, and preconstruction surveying for blunt-nosed leopard lizard, burrowing owl, San Joaquin kit fox, and American badger.
Construction Monitoring, El Centro, San Diego, and Anza Borrego State Park, California — Served as a biological monitor for a variety of energy-related projects throughout San Diego and Imperial counties. Projects have included monitoring for flat-tailed horned lizards for substation and general construction projects as well as general biological monitoring for construction activities involving electrical pole replacement and road grading and paving.
Wetland Delineation
Terra-Gen Solar Projects, Kern County, California — Leading field jurisdictional surveys under the Clean Water Act and California Fish and Game Code 1600 for multiple projects and has prepared aquatic resource delineation reports in support of the lake and streambed alteration agreement (LSAA) and waste discharge requirements (WDR). Prepared LSAA and WDR documents.
Dugas Solar Project, Cordes Lakes, Arizona — Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Copper Rays Solar Project, Pahrump, Nevada — Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Black Hills Solar Project, Sturgis, South Dakota — Assisted with jurisdictional waters surveys and prepared a jurisdictional waters memorandum and an AJD.
White Wing North Solar Project, Dateland, Arizona — Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Arizona City Solar Project, Arizona City, Arizona — Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Alisa Solar Project, Dateland, Arizona — Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Elisabeth Solar Project, Dateland, Arizona — Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Angeles Summit Solar Project, Adelanto, California — Assisted in jurisdictional determinations under the Clean Water Act and California Fish and Game Code 1600 of ephemeral drainages located on the project area and prepared the jurisdictional water report in support of the LSAA and WDR.
Red Valley Solar Project, Moapa, Nevada — Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Viktoria Solar Project, Dateland, Arizona — Performed jurisdictional delineations and prepared a WOTUS memorandum and report for submission to USACE for an AJD.
Valentine Solar Project, Rosamond, California — Assisted in jurisdictional determinations under the Clean Water Act and California Fish and Game Code 1600 of ephemeral drainages located on the project area. Prepared the jurisdictional water report in support of the LSAA.
Permitting
Bonanza Solar Project, Indian Springs, Nevada — Prepared all postsurvey reports as well as the biological resources technical report, DTTP, biological assessment, and WOTUS memorandum and report for submission to USACE for an AJD. Conducted presence-absence and density surveys for desert tortoise. Personally discovered four Mojave desert tortoises and observed desert tortoise tracks, scat, and burrows. Also conducted jurisdictional waters, Gila monster, chuckwalla, burrowing owl, thrasher, and rare plant surveys.
Bullhead Solar Project, Rosamond, California — Performed western Joshua tree census surveys. Prepared ITP application document. Performed jurisdictional determinations under the Clean Water Act and California Fish and Game Code 1600 of ephemeral drainages located on the project area and prepared the jurisdictional water report in support of the LSAA and WDR. Prepared LSAA and WDR application documents.
Tumbleweed Battery Storage Project, Lancaster, California — Wrote preconstruction survey reports, Joshua tree salvage reports, and construction compliance reports. Assisted in jurisdictional determinations under the Clean Water Act and California Fish and Game Code 1600 of ephemeral drainages located on the project area and prepared the jurisdictional water report in support of the LSAA and WDR. Also assisted with Joshua tree seed salvage and replanting efforts.
Southern Bighorn Solar Projects I and II, Moapa, Nevada — Prepared BLM notice to proceed plans, including the weed management plan, restoration plan, environmental compliance monitoring plan, and workers environmental awareness plan. Conducted jurisdictional waters surveys and prepared WOTUS memoranda and reports for submission to USACE for an AJD.
BigBeau Solar Project, Rosamond, California — Assisted in jurisdictional determinations under the Clean Water Act and California Fish and Game Code 1600 of ephemeral drainages located on the project area and prepared the jurisdictional water report in support of the LSAA and WDR. Prepared the LSAA and WDR application forms for submittal to CDFW and Regional Water Quality Control Board. Prepared survey methods for Mohave ground squirrel and desert kit fox and assisted with desert kit fox monitoring, passive relocation, and hand excavations.
Allium Solar Project, Phoenix, Arizona — Assisted with the preparation of the application for a certificate of environmental compatibility. Prepared all biological resources sections.
Silver King Energy Center, Florence Junction, Arizona — Conducted a habitat assessment survey and prepared a survey report as well as biological sections for the Arizona CEC. Conducted jurisdictional waters surveys and prepared a WOTUS memorandum and report for submission to USACE for an AJD. Also prepared a study plan for saguaro mapping for Arizona State Land Department and conducted saguaro census surveys.
Mosey Solar Project, Pahrump, Nevada — Prepared postsurvey reports and WOTUS memoranda and reports for submission to USACE for an AJD. Currently preparing the biological assessment and DTTP. Performed protocol desert tortoise surveys, personally discovering four adult and one juvenile Mojave desert tortoises. Also performed thrasher callback surveys, bat habitat assessments, and jurisdictional waters surveys. Assisted with mesquite woodland mapping and memoranda. Approved by USFWS as a Mojave desert tortoise authorized biologist and performed geotechnical drilling biological monitoring.
Habitat Assessment
Parowan Solar Project, Parowan, Utah — Prepared a biological habitat assessment documenting vegetative covertypes and potential for occurrence of special-status species plants and animals.
Serrano Solar Project, Marana, Arizona — Conducted a habitat assessment and jurisdictional waters surveys. Assisted in preparation of biological resources survey reports for Pima and Pinal counties.
San Eloy Mine Tailings Project, Cochise, Arizona — Performed a biological assessment, jurisdictional waters assessments, and fatal environmental flaw analysis. Prepared an environmental resources assessment for the proposed project.
Cove Mountain Solar Project I and II, Utah — Prepared a biological habitat assessment documenting vegetative covertypes and potential for occurrence of special-status species plants and animals. Also conducted field surveys for all special-status species, including nesting raptors and burrowing owls, and prepared a survey report.
NG-IV2 Transmission Project, California and Arizona — Prepared multiple BTRs in support of the project analyzing all potential impacts to wildlife and special-status species. Assisted with biological habitat assessment fieldwork and prepared a biological habitat assessment and study plan documenting vegetative covertypes, potential for occurrence of special-status species plants and animals, and plans for upcoming surveys in support of the National Environmental Policy Act (NEPA) process. Also assisted in rare plant surveys, golden eagle aerial surveys (helicopter surveys within suitable habitat following USFWS protocols), raptor nesting surveys, bat habitat assessments, and bat exit-count surveys.